Excavated soil
In Wallonia, soil traceability is regulated and contaminated ground can blow a budget apart after the contract is awarded. The diagnosis is done beforehand, not during the works.
What we work on
From the municipal road to the interchange, a road is a stack of layers, each with its own function and cost.

Roads and pavements, sewerage and utility networks, roundabouts and junctions, interchanges, car parks, manoeuvring areas and accesses. We handle geometry, pavement structure layers, drainage, signage and coordination with utility operators.
Points of attention
In Wallonia, soil traceability is regulated and contaminated ground can blow a budget apart after the contract is awarded. The diagnosis is done beforehand, not during the works.
An unrecorded network means a work stoppage and a claim. Consulting network operators and prior surveying are not a formality.
A shopping street closed for too long means angry shopkeepers and complaints. Phasing is designed at project stage, not on site.
Actual bearing capacity is verified when the subgrade is signed off. Skip this stage and you accept settlement within three years.
Regional standard specifications — CCT Qualiroutes in the Walloon Region, CCT 2015 in the Brussels-Capital Region, Standaardbestek 250 in the Flemish Region. Public procurement regulations for contracting authorities. Prior survey of underground utilities.